Get a quote in 24h
Menu

Industry · food and beverage

Food plant arc flash study that never stops a production line

US arc flash studies, PE-reviewed, quoted in 24 hours. Field work booked around sanitation, not over it.

  • PE-reviewed
  • Built on current NFPA 70E-2027
  • IEEE 1584-2018
  • Field engineers travel to every US state
  • Written quote in 24 hours

A food plant arc flash study calculates incident energy at every switchboard, motor control center and washdown panel that runs your lines, refrigeration and utilities, then sets boundaries and PPE for each. AFSC schedules field work across weekend and night shifts and installs labels rated for washdown, so lines keep running all week.

Why now

What usually puts a food plant study on the agenda

An insurer or customer audit

Insurer and customer audits can cover electrical safety as well as food safety. A current study answers the electrical questions.

A new line or a refrigeration upgrade

Added compressors and lines change fault current at the main board and in the motor control centers that feed them.

Labels that did not survive washdown

Chemical cleaning and hot water strip ordinary labels fast. Unreadable labels count as missing labels.

Hazards and governing standards in food and beverage plants

What shapes electrical safety in food processing
ReferenceWhy it matters here
NFPA 70E-2027Risk assessment, labels and PPE for electrical work
IEEE 1584-2018Incident energy at each switchboard and motor control center
NEC (NFPA 70) 110.28Enclosure types for wet and washdown locations
OSHA 29 CFR 1910.147Lockout and tagout during sanitation and maintenance

Your sanitation calendar sets our schedule

Tell us your shift pattern and planned shutdowns. We send a fixed price and a field plan that keeps every line running within one business day.

Plan around my shifts

Typical scope in a food or beverage plant

EquipmentWhat we model and label
Service and main switchboardUtility fault current and the main protective devices at 480 V or medium voltage
Refrigeration compressorsLarge motors and their starters in the engine room
Motor control centersProcess lines, conveyors, mixers and fillers
Washdown panelsStainless enclosures in wet production areas
UtilitiesBoilers, air compressors and wastewater treatment

What a typical project looks like

Illustrative scenario, no client named and no figures claimed: a food plant studied across weekend shifts. Engineers survey the engine room and main board on Saturday, move to the process areas after sanitation crews clear them, and install washdown-rated labels before the Monday start. Production never notices they were there.

Food processing plant arc flash risks you will not find in a warehouse

Food processing plant arc flash risks come from wet environments, ammonia refrigeration with large motors, and frequent changeovers that send electricians into panels during production. Water, corrosion and cleaning chemicals also age equipment faster, which slows protective devices and raises incident energy. The study and maintenance plan have to account for both.

Frequently asked questions

Question not here? Ask an engineer

Does a food plant need an arc flash study?

Yes. Any workplace where employees service energized electrical equipment needs an arc flash risk assessment under NFPA 70E-2027, and OSHA expects employers to protect against the hazard. Food plants add wet locations and frequent changeovers, which put maintenance staff near energized panels more often than in a typical factory.

Can the field work avoid production days?

Yes. We schedule surveys on weekends, night shifts and sanitation windows, and work area by area so each zone is visited once. Where a cover must come off, we use planned shutdowns. Your production manager approves the plan before we arrive, so nothing surprises the line.

Will your engineers follow our food safety rules?

Yes. Our engineers follow your GMP, hygiene and allergen rules, wear the clothing your zones require, and bring only tools and materials you approve for production areas. Send your contractor rules with the quote request and we confirm each one in the proposal.

What labels survive washdown?

Labels for washdown areas are printed on industrial stock with a protective laminate chosen for hot water and cleaning chemicals, and placed where spray hits least. We match the material to each area, so the dry electrical room and the wet filling hall do not get the same label.

Does the ammonia refrigeration system change the study?

Yes, it matters. Refrigeration compressors are some of the largest motors in a food plant, and they contribute fault current to the boards that feed them. They are also critical to cold chain, so we plan their survey with your refrigeration team to avoid any interruption to cooling.

How fast can we get a price?

Within 24 hours. Send your one-line diagram, or a list of switchboards and motor control centers with your shift pattern, and an engineer returns a fixed written price and a dated field plan built around your sanitation schedule. No site visit is needed to quote.

Get your arc flash study quoted

Tell us about your facility. An engineer replies within one business day with scope, timeline and price.

  • IEEE 1584-2018 and NFPA 70E-2027, PE-reviewed
  • Labels and training in the same scope
  • Field engineers travel to any US state
Get a quote in 24h