Get a quote in 24h
Menu

Free tool

Arc flash study expiration checker: know your review date today

US arc flash studies, PE-reviewed, quoted in 24 hours. Start with the date your study runs out.

  • PE-reviewed
  • Built on current NFPA 70E-2027
  • IEEE 1584-2018
  • Field engineers travel to every US state
  • Written quote in 24 hours

Arc flash study expiration is the date your study stops meeting NFPA 70E-2027: five years after it was done, or sooner if the system changed. Enter the month and year of your last study and tick anything that changed since. The checker tells you whether it is current, due soon or overdue.

When was your last arc flash study?
Has anything changed since then?

How to read your result

The badge gives the date status and any change you ticked overrides it. A change means the study no longer matches the gear, whatever the calendar says.

ResultWhat it meansWhat to do
CurrentMore than 12 months until the 5-year reviewNote the due date and plan the review into next year's budget
Due soon12 months or less until the reviewBook the update now so field work fits an outage window
OverduePast the 5-year review dateTreat labels as unverified and get an update quoted this week
Update needed nowA ticked change has moved the numbersUpdate the affected part of the model and relabel it
Five-year arc flash study review cycle Study review timeline. Current from the study date to year 4. Due soon in year 5. Overdue after year 5, the maximum review interval in NFPA 70E-2027. The due soon window is illustrative. Sample, illustrative values. Study review cycle Sample, illustrative values Current Due soon Overdue 5-year review limit Study Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Review at intervals of no more than 5 years (NFPA 70E-2027), and after any major modification. The 12-month due-soon window is illustrative.

Arc flash study renewal without starting over

Arc flash study renewal rarely means a brand new study. If your model and report are on file, the review verifies the installed equipment, applies the changes, recalculates to IEEE 1584-2018 and replaces labels that moved. A clean renewal is faster and cheaper than the first study, and it resets the 5-year clock.

Frequently asked questions

Question not here? Ask an engineer

How long is an arc flash study good for?

An arc flash study is good for up to five years under NFPA 70E-2027, and only while the system stays the same. A new transformer, a utility change, new equipment or changed protective device settings end its validity early, because the incident energy values no longer describe the gear that is actually installed.

What date does the 5-year clock start from?

The clock starts from the date of the study or of its last documented review, as recorded in the report. If you cannot find that date, treat the study as overdue. We can confirm the date from the report and the labels during a short scope call at no charge.

Does the checker replace an engineering review?

No. The checker applies the review interval and flags common change triggers, but only an engineer comparing the model with the installed equipment can confirm the numbers still hold. Use the result to decide when to act, then ask for an update quote to confirm the scope.

Our labels have no date on them. What now?

Undated labels are a common audit finding, because nobody can prove they are current. Assume the study needs review. We match the labels to a report if one exists, confirm the values, and print new labels that carry the study date, which closes that finding for good.

Is a study from a previous owner still valid?

Not automatically. A study bought by a previous owner is only as good as its data and its date. If it is under five years old and the system has not changed, we can verify and adopt it. Otherwise it needs an update before anyone relies on the labels.

Can you remind us before the next review is due?

Yes. When we complete a study or update, the report records the next review date. Ask for a reminder when you accept the quote and we will contact you ahead of that date, so you can budget the review and book field work around your outage calendar.

Get an update quote based on your result

Tell us about your facility. An engineer replies within one business day with scope, timeline and price.

  • IEEE 1584-2018 and NFPA 70E-2027, PE-reviewed
  • Labels and training in the same scope
  • Field engineers travel to any US state
Get a quote in 24h