Get a quote in 24h
Menu

Arc flash engineering for US facilities

Arc flash consultants who quote in 24 hours and install the labels

US arc flash studies, PE-reviewed, quoted in 24 hours. One team from field data to labels on your gear.

  • PE-reviewed
  • Built on current NFPA 70E-2027
  • IEEE 1584-2018
  • Field engineers travel to every US state
  • Written quote in 24 hours

Arc flash consultants are electrical engineers who model your power system, calculate the incident energy at every piece of equipment and set the PPE and boundaries your crews work to. Arc Flash Study Consultants (AFSC) does all of it for US facilities, to IEEE 1584-2018 and NFPA 70E-2027, with a written quote in 24 hours.

Sample one-line diagram with incident energy One-line diagram. Utility source feeds SWGR-1 at 13.8 kV, then main transformer T1 (13.8 kV to 480 V) feeds SWGR-2 at 480 V. SWGR-2 feeds MCC-1A and MCC-1B at 480 V and transformer T2 to panelboard LP-1 at 208 V. Incident energy: SWGR-1 6.1, SWGR-2 32.4, MCC-1A 4.9, MCC-1B 2.7, LP-1 1.4 cal/cm². Sample, illustrative values. One-line diagram Sample, illustrative values UTILITY SOURCE SWGR-1 · 13.8 kV T1 13.8 kV / 480 V SWGR-2 · 480 V T2 480 / 208 V MCC-1A480 V MCC-1B480 V LP-1208 V 6.1 cal/cm² 32.4 cal/cm² 4.9 cal/cm² 2.7 cal/cm² 1.4 cal/cm² Incident energy at working distance: 36 in at 13.8 kV, 18 in at 480 V and 208 V.

Why now

Six deadlines that put a study on the calendar

Your study is turning 5

NFPA 70E-2027 caps the review interval at 5 years. Past that date, your labels describe a system you may no longer have.

Check if your study is due

An OSHA inspector asked for it

Inspectors ask for the hazard assessment behind your labels. We turn a citation into a documented, dated close-out.

Close out the citation

Your insurer flagged it

Loss-control reports often list a missing or outdated arc flash study. We hand you the study and the records to clear the item.

Answer your insurer

A turnaround is on the calendar

An outage is the moment to verify de-energized gear and hang new labels. Book early and the field work fits inside your window.

Plan around my outage

New or changed equipment

A new transformer, a utility change or new relay settings can move incident energy at every bus downstream.

Update my study

The 2026 NEC label rules

The 2026 NEC revises arc flash hazard marking in section 110.16. Check that your labels keep pace before the next walkdown.

See the label rules

Arc flash study services, from field data to labels on the gear

Our arc flash study services cover the whole job: field data collection, the system model, short circuit and coordination checks, incident energy at every bus, labels printed and installed, and NFPA 70E-2027 training for the people who work on the gear. One team, one scope, one written quote, one point of contact.

IEEE 1584-2018

Arc flash study

Field data, system model, incident energy at every bus, and labels installed on site.

See what's included
NFPA 70E-2027

Study update (5-year review)

Re-verify your model after changes and recalculate to the current method.

Check if yours is due
NFPA 70E-2027

Arc flash risk assessment

Hazard identification, likelihood, PPE selection and the boundaries your crews work to.

See the assessment
Fault duty · selectivity

Short circuit and coordination

Fault duty checks and protective device settings that clear faults fast and selectively.

See the study
NFPA 70E-2027 130.5(H)

Arc flash labels

We print durable labels from your study data, supply them and install them on every assessed piece of equipment.

See label options
NFPA 70E-2027

NFPA 70E training

Onsite or virtual training for qualified workers, matched to the labels on your gear.

Plan a session
OSHA 29 CFR 1910

NFPA 70E compliance

Gap review of your electrical safety program, procedures and records against NFPA 70E.

Review your program
No-obligation scope call

Not sure what you need?

Tell us what changed, what the auditor wrote, or when your last study was done. We tell you what is required and what can wait.

Book a scope call

Four steps, a dated plan from day one

How an arc flash study runs, in four steps Step 01: Quote in 24 hours. Send what you have. Scope, price, dated timeline. Step 02: Field data. Nameplates, cables and device settings verified on site. Step 03: Model and analysis. Short circuit, coordination, incident energy to IEEE 1584-2018. Step 04: Report, labels, training. PE-reviewed report, labels installed, workers trained. 01 Quote in 24 hours Send what you have.Scope, price, dated timeline. 02 Field data Nameplates, cables and devicesettings verified on site. 03 Model and analysis Short circuit, coordination,incident energy to IEEE 1584-2018. 04 Report, labels, training PE-reviewed report, labelsinstalled, workers trained. How an arc flash study runs, in four steps Step 01: Quote in 24 hours. Send what you have. Scope, price, dated timeline. Step 02: Field data. Nameplates, cables and device settings verified on site. Step 03: Model and analysis. Short circuit, coordination, incident energy to IEEE 1584-2018. Step 04: Report, labels, training. PE-reviewed report, labels installed, workers trained. 01 Quote in 24 hours Send what you have.Scope, price, dated timeline. 02 Field data Nameplates, cables and devicesettings verified on site. 03 Model and analysis Short circuit, coordination,incident energy to IEEE 1584-2018. 04 Report, labels, training PE-reviewed report, labelsinstalled, workers trained.

Arc flash engineering services for industrial and mission-critical sites

Arc flash engineering services change with the site. A refinery needs field work timed to a turnaround, a data center needs work sequenced around redundant feeds, and a food plant needs crews who fit around sanitation and production runs. We plan each study around how your site actually operates.

Your quote is one form away

Tell us the site, the voltage and the deadline. An engineer sends scope, price and a dated timeline within one business day.

Get my quote

What a typical project looks like

Refining · Gulf Coast

A study update inside a turnaround window

Field data is walked down before the outage, the model is ready when the units come down, and labels go on while the gear is de-energized. No extra shutdown.

Data center

A study planned around redundancy

Data collection runs one side of an A/B system at a time, so the load stays protected. Every step is scheduled with your facilities team before anyone opens a panel.

Food and beverage

A plant studied across weekend shifts

Field work runs on weekend and night shifts, so lines keep running Monday to Friday. Your sanitation and production calendar sets the plan, not ours.

Illustrative scenarios. No client names, results or figures are claimed.

Arc flash labels

Labels that match your study

Labels are printed from your study data, so the numbers on the gear match the report. We supply them and install them on site.

Sample arc flash warning label Sample arc flash warning label. Nominal system voltage: 480 VAC. Arc flash boundary: 42 in. Incident energy: 4.9 cal/cm². at working distance: 18 in. Equipment: MCC-1A. Study date: 03/2026. Fields per NFPA 70E-2027 130.5(H). Sample, illustrative values. WARNING Arc flash and shock hazard · appropriate PPE required Nominal system voltage 480 VAC Arc flash boundary 42 in Incident energy 4.9 cal/cm² at working distance 18 in Equipment MCC-1A Study date 03/2026 SAMPLE Label fields per NFPA 70E-2027 130.5(H). Sample, illustrative values. Not for use on equipment.

Pricing

Know your price before anyone books a flight

Price follows scope: how many buses, the highest voltage, and whether your drawings are current. Share your one-line diagram and we return a fixed price in writing within a day, so you can budget with confidence.

Fixed quote

One-line diagram in, fixed written price back within 24 hours.

What to look for in an arc flash study provider

A good arc flash study provider verifies field data on site, models to IEEE 1584-2018, has a licensed Professional Engineer review the results, prints labels from the same data, and trains your crews to read them. Ask for a sample report and a dated timeline before you sign anything.

Study done right vs labels that fail an audit
CheckStudy done rightLabels that fail an audit
Field dataVerified on site against the gearCopied from old drawings
MethodIEEE 1584-2018 incident energy at every busOlder or undocumented method
ReviewReviewed by a US-licensed PENo engineering review
LabelsPrinted from the study and installedGeneric labels or none
Next reviewDated within 5 yearsNo date on file

Comparing arc flash study companies

Arc flash study companies differ in four ways that matter: who collects the field data, which method they model to, who reviews the results, and whether labels and training are included. Compare those four before you compare price, because a cheap study that misses equipment costs you a second study.

Frequently asked questions

Question not here? Ask an engineer

Who provides arc flash studies?

Arc flash studies are provided by electrical engineering firms that model power systems and calculate incident energy. AFSC is one of them: our field engineers collect the data, our engineers build the model, a US-licensed Professional Engineer reviews the results, and we install the labels. You get one accountable team instead of three vendors.

Where can I find an arc flash study companies list?

No official arc flash study companies list exists; OSHA and NFPA do not certify providers. Build your own shortlist from firms that model to IEEE 1584-2018, use licensed engineers, verify data on site and include labels. Then ask each for a sample report and a written quote with a dated timeline.

How much will our study cost?

Cost depends on how many buses are in scope, the highest voltage and the state of your drawings. We do not guess. Send your one-line diagram and site details, and we return a fixed written price within 24 hours. No scope call fee and no obligation to proceed.

Will the field work shut down our plant?

No, not as a rule. Most data collection happens with the gear energized, from outside the enclosures, by engineers in the right PPE. Anything that needs a cover opened is scheduled into your existing outage or turnaround windows, agreed with your team before we arrive on site.

How fast can you start?

Your written quote arrives within 24 hours of your request. Once you accept it, we schedule the site visit around your production calendar and outage windows. The quote itself carries a dated timeline, so you know when field work, the report and the labels will land.

Who reviews and signs off the study?

A US-licensed Professional Engineer reviews every study before it reaches you. The engineer checks the model, the inputs and the results, and confirms the labels match the report. That review is part of the price, not an add-on, on every study we deliver.

Do you install the labels or just print them?

Yes, both. We print durable labels from your study data, supply them, and our field engineers install them on every assessed piece of equipment. The label on the gear and the line in the report always match, which is exactly what an inspector checks first.

Do you work in my state?

Yes. Our field engineers travel to sites in every US state. Multi-site programs get one scope, one schedule and one report format across all locations, which keeps your labels consistent from plant to plant and makes the next review much simpler to run.

Get your arc flash study quoted

Tell us about your facility. An engineer replies within one business day with scope, timeline and price.

  • IEEE 1584-2018 and NFPA 70E-2027, PE-reviewed
  • Labels and training in the same scope
  • Field engineers travel to any US state
Get a quote in 24h