Get a quote in 24h
Menu

Industries

Arc flash studies planned around how your industry actually runs

US arc flash studies, PE-reviewed, quoted in 24 hours. Same engineering standard, a different plan for every site type.

  • PE-reviewed
  • Built on current NFPA 70E-2027
  • IEEE 1584-2018
  • Field engineers travel to every US state
  • Written quote in 24 hours

Every industry gets the same engineering: field-verified data, a model to IEEE 1584-2018, incident energy at every bus, PE review and installed labels. What changes is the plan. Turnarounds, redundancy, sanitation shifts, retooling, outage calendars and commissioning dates decide when and how we work, and each industry page shows how.

Choose your industry

Turnarounds and classified areas

Refining, petrochemical and chemical

Refinery studies
A and B redundancy

Data centers

Data center studies
Sanitation and washdown

Food and beverage

Food plant studies
Retooling and busway

Manufacturing

Manufacturing plant studies
OSHA 1910.269 and NESC

Utilities and power generation

Utility studies
AC and DC methods

Solar and battery storage

Solar and storage studies

Your site has its own constraints. Tell us what they are.

Describe your shutdown windows and access rules with the quote request. The plan we send back is built around them, within one business day.

Get my site quoted

What stays the same in every industry

ConstantIn every study
MethodIncident energy to IEEE 1584-2018 for AC; DC methods referenced by NFPA 70E-2027
DataVerified on site by our field engineers
ReviewEvery study reviewed by a US-licensed Professional Engineer
LabelsPrinted from study data and installed
QuoteFixed written price within 24 hours

Frequently asked questions

Question not here? Ask an engineer

Do you work in industries not listed here?

Yes. Hospitals, water and wastewater plants, pharmaceutical sites, semiconductor fabs, commercial campuses and warehouses all need the same study, and we quote them the same way. Dedicated pages for those industries are on the way. Request a quote and tell us what your site does.

Why does the industry change the plan?

Because access and downtime differ. A refinery works to turnarounds, a data center protects redundancy, and a food plant schedules around sanitation. The engineering method stays the same; the field plan, labels and timing change so the study fits how your site really operates.

Do you have experience in our sector?

Our engineers plan studies around the constraints on each industry page: turnarounds, redundant power paths, washdown areas, outage calendars and commissioning schedules. Ask in your quote request and we describe how we would approach your site, with an illustrative scenario, before you commit to anything.

Can one study cover several of our sites in different industries?

Yes. Multi-site owners get one scope format, one report structure and one label standard across every site, with field plans tailored to each. That consistency makes audits easier and lets your safety team compare sites like for like, even when the plants do very different things.

How do I start?

Send your one-line diagram, or describe the site and its shutdown windows, with the quote form. An engineer returns a fixed written price and a dated field plan within 24 hours. There is no charge for the quote and no obligation to go ahead.

Is there a sample report for my industry?

The sample report shows the format every industry receives: one-line diagram, incident energy table, labels and PE review. Industry-specific sections, such as operating modes for data centers or DC results for storage, are added to your own report as the site requires.

Get your arc flash study quoted

Tell us about your facility. An engineer replies within one business day with scope, timeline and price.

  • IEEE 1584-2018 and NFPA 70E-2027, PE-reviewed
  • Labels and training in the same scope
  • Field engineers travel to any US state
Get a quote in 24h